CASE STUDIES
SUCCESS STORIES with C2B Platform
STRUCTURAL ELEMENTS LEVELING INSPECTION
Correct leveling of elements in the construction process requires many hours of work by highly qualified personnel, representing a high cost of multiple revisions, before and after finding any deviation.
SITE-CAST ELEMENTS INSPECTION
Errors when pouring concrete in the structural phase of a project can represent high rework costs that can be prevented with the use of technological tools.
PREFABRICATED CURTAIN WALL INSTALLMENT
When using prefabricated modules for construction the Innovative building designs may represent cost overruns if the prefabricated modules are not correctly placed.
WATER PIPES INSTALLATION INSPECTION
Pipe installation requires a post review to verify proper placement. To guarantee the precise level of these elements, will represent the fluid performance of the entire aqueduct and sewage system.
Customer Support
If you’re currently using our solution and can’t locate the answer to your question in the Questions and Answers section, please reach out to our technical support.
Rest assured, providing a speedy resolution to your inquiry is of utmost importance to us as we continuously strive to enhance your customer experience.
Customer Support
If you’re currently using our solution and can’t locate the answer to your question in the Questions and Answers section, please reach out to our technical support.
Rest assured, providing a speedy resolution to your inquiry is of utmost importance to us as we continuously strive to enhance your customer experience.