CASE STUDIES

SUCCESS STORIES with C2B Platform

point clud heat map of ditsnce

STRUCTURAL ELEMENTS LEVELING INSPECTION

Correct leveling of elements in the construction process requires many hours of work by highly qualified personnel, representing a high cost of multiple revisions, before and after finding any deviation.

Stairs 3D model and point cloud

SITE-CAST ELEMENTS INSPECTION

Errors when pouring concrete in the structural phase of a project can represent high rework costs that can be prevented with the use of technological tools.

point clud heat map of ditsnce

PREFABRICATED CURTAIN WALL INSTALLMENT

 When using prefabricated modules for construction the Innovative building designs may represent cost overruns if the prefabricated modules are not correctly placed.

WATER PIPES INSTALLATION INSPECTION

Pipe installation requires a post review to verify proper placement. To guarantee the precise level of these elements, will represent the fluid performance of the entire aqueduct and sewage system.